# Rize

> From a 10% build to a shipping MVP in one month, then the whole UI/UX rebuilt in a second.

I joined with the product about a tenth built, shipped a complete MVP in the first month, then rebuilt the platform’s UI and UX end to end in the second — before the AI wave reshaped the space.

---

Source: https://fadymondy.com/en/portfolio/rize
